(Wed, Aug 3 2011 10:30 PM to Thu, Aug 4 2011 4:30 AM) Trains in both directions will operate on the same track between the
Sox-35th and Cermak-Chinatown stations, resulting in minor delays.
(Wed, Aug 3 2011 10:30 PM to Thu, Aug 4 2011 4:30 AM) Trains in both directions will operate on the same track between the
Sox-35th and Cermak-Chinatown stations, resulting in minor delays.
(Thu, Aug 4 2011 10:30 PM to Fri, Aug 5 2011 4:30 AM) Red Line trains in both directions will operate normally between 63rd and 79th.
(Thu, Aug 4 2011 10:30 PM to Fri, Aug 5 2011 4:30 AM) Red Line trains in both directions will operate normally between 63rd and 79th.
(Wed, Aug 3 2011 10:30 PM to Thu, Aug 4 2011 4:30 AM) Red Line trains in both directions will operate normally between 63rd and 79th.
(Wed, Aug 3 2011 10:30 PM to Thu, Aug 4 2011 4:30 AM) Red Line trains in both directions will operate normally between 63rd and 79th.
(Tue, Aug 2 2011 to TBD) The elevator at 69th (Red Line) is temporarily out-of-service.
(Tue, Aug 2 2011 to TBD) The street to mezzanine elevator at Randolph/Washington (Red Line) is temporarily out-of-service.
(Fri, Jul 29 2011 2:00 PM to Fri, Aug 12 2011 2:00 PM) Buses will operate in both directions via 91st, Mackinaw, Harbor, South Chicago, 95th, and Ewing.
(Mon, Aug 1 2011 to TBD) The elevator at Central/Lake (Green Line) is temporarily out-of-service.
(Sun, Jul 31 2011 to TBD) The street-to-mezzanine elevator at California/Lake (Green Line) is temporarily out-of-service.
(Sun, Jul 31 2011 to TBD) The mezzanine-to-platform elevator at Library (Brown Line) is temporarily out-of-service.
(Sun, Jul 31 2011 to TBD) The mezzanine-to-platform elevator at Randolph/Washington (Red Line) is temporarily out-of-service.
(Sun, Jul 31 2011 to TBD) The street to mezzanine elevator at Kedzie (Green Line) is temporarily out-of-service.
(Sat, Jul 30 2011 to TBD) The mezzanine-to-platform elevator at Logan Square (Blue Line) is temporarily out-of-service.
(Sat, Jul 30 2011 to TBD) The elevator at Library to the Orange, Pink and Purple Line platform is temporarily out-of-service.
(Thu, Aug 4 2011 9:30 AM to 3:00 PM) Buses in both directions will operate via California, Roosevelt, Sacramento, Taylor, and California.
(Sat, Jul 30 2011 6:00 PM to Sun, Jul 31 2011 6:00 AM) Buses are rerouted due to filming on Madison between Michigan and Wabash.
(Sat, Jul 30 2011 6:00 PM to Sun, Jul 31 2011 6:00 AM) Northbound buses will operate via Michigan, Adams, and State, then resume their normal route on Madison.
(Sat, Jul 30 2011 6:00 PM to Sun, Jul 31 2011 6:00 AM) EB #20,SB #56 – via Washingtn, State, Madsn, ending at Madsn/Dearbrn. WB #20, NB #56 – begin at Madsn/Dearbrn, then resume normal route.
(Sat, Jul 30 2011 11:00 AM to 6:00 PM) Buses are rerouted due to filming on Van Buren between Federal and Dearborn.
Read and browse PDFs of reports and studies looking at Chicago traffic and how best to battle congestions.