(Mon, Mar 7 2011 to TBD) #70 Division buses are temporarily rerouted via Kostner, Augusta, and Pulaski.
(Mon, Mar 7 2011 to TBD) #70 Division buses are temporarily rerouted via Kostner, Augusta, and Pulaski.
(Mon, Mar 7 2011 to TBD) The elevator to the 95th/Loop-bound platform at Fullerton (Red/Brown/Purple Line Express) is temporarily out-of-service.
(Sat, Mar 5 2011 to TBD) The elevator at Western (Pink Line) is temporarily out-of-service.
(Thu, Mar 10 2011 11:00 PM to Fri, Mar 11 2011 4:00 AM) Trains in both directions will operate on the same track between Jackson and Racine, resulting in minor delays.
(Wed, Mar 9 2011 11:00 PM to Thu, Mar 10 2011 4:00 AM) Trains in both directions will operate on the same track between Jackson and Racine, resulting in minor delays.
(Tue, Mar 8 2011 11:00 PM to Wed, Mar 9 2011 4:00 AM) Trains in both directions will operate on the same track between Jackson and Racine, resulting in minor delays.
(Mon, Mar 7 2011 11:00 PM to Tue, Mar 8 2011 4:00 AM) Trains in both directions will operate on the same track between Jackson and Racine, resulting in minor delays.
(Tue, Mar 1 2011 to TBD) The elevator at 35th-Bronzeville-IIT (Green Line) is temporarily out-of-service..
(Mon, Jan 17 2011 to TBD) A new southbound bus stop will be temporarily added at the northeast corner of Franklin/Randolph.
(Fri, Jun 18 2010 12:01 AM to Thu, May 31 2012 5:00 AM) Northbound buses will operate via Harrison, Canal, Monroe, Wacker, and Jackson, then resume their normal route on Franklin.
(Fri, Jun 18 2010 12:01 AM to Thu, May 31 2012 5:00 AM) Northbound buses will operate via Harrison, Canal, Monroe, Wacker, and Jackson, then resume their normal route on Franklin.
(Mon, Jan 3 2011 to TBD) Bus stops will be temporarily eliminated or relocated due to the Wacker Drive Reconstruction Project.
(Fri, Jun 18 2010 12:01 AM to Thu, May 31 2012 5:00 AM) NB buses via Jackson, Franklin, Lake, Post Place, then normal route. SB buses via Lower Wacker, to Randolph/Upper Wacker, then normal route.
(Mon, Jan 3 2011 to TBD) SB – via Wells, Upper Wacker. Lake, then normal route.
(Mon, Jan 3 2011 to TBD) A.M. Rush – NB via Drbrn, Madison, Canal, Randolph, then normal rte.
P.M. Rush – SB via Canal, Randolph, Clinton, Monroe, then normal rte.
(Mon, Jan 3 2011 to TBD) EB #60 rerouted via Canal, Monroe, Franklin, then normal route.
(Mon, Jan 3 2011 to TBD) EB #19, #20 rerouted via Washington, Cinton, Monroe, Franklin, then resume normal route on Washington.
(Tue, Mar 1 2011 6:00 AM to Fri, Sep 30 2011 4:00 PM) Buses in both directions will operate via 95th, King Drive, 103rd, and Cottage Grove.
(Mon, Jan 3 2011 to TBD) WB #123 – via Upper Wacker, Franklin, Adams, Clinton, then normal route.
EB – via Jackson, Franklin, rthen normal route.
(Mon, Jan 3 2011 to TBD) EB – via Canal, Lake, then normal route.
Read and browse PDFs of reports and studies looking at Chicago traffic and how best to battle congestions.