(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) WB 121 and 123 buses will operate via Upper Wacker, Randolph, and Clinton, ending their trips at Clinton/Adams.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) WB 121 and 123 buses will operate via Upper Wacker, Randolph, and Clinton, ending their trips at Clinton/Adams.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Eastbound 124 buses will operate via Canal, Washington, and Upper Wacker.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) 129 PM rush period, NB via Adams, Frnklin, Mdisn, Canal, ending at Ogilvie Trans Cntr. AM rush and SB evening rush trips not affected.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Westbound 130 buses will operate via Adams, Franklin, and Madison, then resume their normal route on Canal.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) SB 134 Stockton/LaSalle Express, 135 Clarendon/LaSalle Express, and 136 Sheridan/LaSalle Express buses will end trips at Adams/Wells.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Southbound 151 buses will operate via Michigan, Madison, Clinton, and Adams, then resume their normal route on Canal.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Southbound 156 buses will operate via Adams, Franklin, and Van Buren, then resume their normal route on Desplaines.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Westbound 60 and 157 buses will continue to operate via Randolph and Clinton to Madison, then resume their normal route on Clinton.
(Mon, Jan 9 2012 to TBD) EB 120 begin Canal/Rand, via Canal, Wshingtn, Frnklin, Lake, Post Pl, Lwr Wckr. WB Grand, Wabsh, Upper Wckr, Rand, Canal, ending Canal/Rand.
(Tue, Jul 5 2011 to TBD) EB 120 begin Canal/Rand, via Canal, Wshingtn, Frnklin, Lake, Post Pl, Lwr Wckr. WB Grand, Wabsh, Upper Wckr, Rand, Canal, to Canal/Rand.
(Tue, Jul 5 2011 to Sat, Jun 16 2012 5:00 AM) 60 and 157 EB: normal route via Canal and Washington. WB: via Randolph and Clinton.
(Fri, Jun 18 2010 12:01 AM to Sat, Jun 16 2012 5:00 AM) Northbound 135 Clarendon/LaSalle Express and 136 Sheridan/LaSalle Express buses will begin their trips at Franklin/Jackson.
(Fri, Jun 18 2010 12:01 AM to Sat, Jun 16 2012 5:00 AM) Northbound 11 buses operate via Harrison, Canal, and Jackson, then resume their normal route on Franklin.
(Fri, Jun 15 2012 8:53 AM to TBD) 30 South Chicago buses are temporarily rerouted via 131st, South Avenue N, and 133rd.
(Fri, Jun 15 2012 9:03 AM to TBD) Northbound 151 Sheridan and 156 LaSalle buses are temporarily rerouted via Sheridan, Addison, and Halsted.
(Mon, Jan 9 2012 to Sat, Jun 16 2012 5:00 AM) Stage 3 of Wacker Drive reconstruction begins Monday, January 9. Nineteen CTA bus routes will be affected.
(Fri, Jun 22 2012 10:45 AM to 3:00 PM) The Armitage station elevator to/from the Kimball-bound platform will be temporarily out of service.
(Thu, Jun 21 2012 10:45 AM to 3:00 PM) The Armitage station elevator to/from the Kimball-bound platform will be temporarily out of service.
(Wed, Jun 20 2012 10:45 AM to 3:00 PM) The Armitage station elevator to/from the Kimball-bound platform will be temporarily out of service.
(Tue, Jun 19 2012 10:45 AM to 3:00 PM) The Armitage station elevator to/from the Kimball-bound platform will be temporarily out of service.
Read and browse PDFs of reports and studies looking at Chicago traffic and how best to battle congestions.