(Tue, Jan 10 2012 10:30 PM to Wed, Jan 11 2012 4:00 AM) Trains in both directions will operate on the same track between North/Clybourn and Lake, resulting in minor delays.
(Tue, Jan 10 2012 10:30 PM to Wed, Jan 11 2012 4:00 AM) Trains in both directions will operate on the same track between North/Clybourn and Lake, resulting in minor delays.
(Mon, Jan 9 2012 10:30 PM to Tue, Jan 10 2012 4:00 AM) Trains in both directions will operate on the same track between North/Clybourn and Lake, resulting in minor delays.
(Sun, Jan 8 2012 10:00 PM to Mon, Jan 9 2012 4:00 AM) Trains in both directions will operate on the same track between North/Clybourn and Lake, resulting in minor delays.
(Sat, Jan 7 2012 11:00 PM to Sun, Jan 8 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Sat, Jan 7 2012 11:00 PM to Sun, Jan 8 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Sat, Jan 7 2012 11:00 PM to Sun, Jan 8 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Fri, Jan 6 2012 11:00 PM to Sat, Jan 7 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Fri, Jan 6 2012 11:00 PM to Sat, Jan 7 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Fri, Jan 6 2012 11:00 PM to Sat, Jan 7 2012 6:00 AM) Trains in both directions will operate on the same track between Sox-35th and Cermak-Chinatown, resulting in minor delays.
(Sat, Jan 7 2012 10:00 PM to Sun, Jan 8 2012 6:00 AM) The planned work affecting boarding at the Grand, Chicago, and Division stations is cancelled.
(Fri, Jan 6 2012 10:00 PM to Sat, Jan 7 2012 6:00 AM) Trains in both directions will operate on the same track between Clark/Lake and Damen, resulting in minor delays.
(Thu, Jan 5 2012 8:00 AM to 12:00 PM) Buses will operate in both directions via Roosevelt, Pulaski, 16th, Kostner, and Roosevelt.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) EB #20 & #56 – nrml rte on Washngtn..
WB #20- Madisn, Frnkln, Randolph, Clintn, nrml rte.
WB #56 – Madisn, LaSalle,Randolph, nrml rte.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) EB – via Canal, Washington, Franklin, and Upper Wacker.
WB – via Michigan, Randolph, and Clinton to Quincy.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) WB _ via Upper Wackr, Frnklin, Adams, Clinton, ending at Clinton/Adams.EB- begin at Jcksn/Canal, via Jcksn ,Frnklin, nrml rte.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) EB – begin at Canal/Rndlph ,operate via Canal, Wshingtn, Frnkln, tnrml rte. WB – via Upper Wacker, Randlph, Canal, ending at Canal/Rndlph.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) EB – begin at Clntn/Adams. via Clintn, Jcksn, Frkln, Lake, Post , nrml rte. WB – Grand, Wabsh, Upper Wckr. Frnkln, Adams, Clintn.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) WB – via Michign, Madisn, Franklin, Randolph to Halsted, then normal route. EB – via Washingtn, Michign, ending at Michign/Randolph.
(Tue, Jul 5 2011 to Sun, Jan 8 2012) NB- via Mdisn, Drbrn, Rndlph, Desp, Wshngtn, ending at Wshngtn/Desp.SB – begin at Wshngtn/Desp, operate via Wshngtn,Clintn, then nrml rt.
(Wed, Jan 4 2012 4:55 PM to TBD) The elevator to the Harlem/Lake-bound platform at Cottage Grove (Green Line) is temporarily out-of-service.
Read and browse PDFs of reports and studies looking at Chicago traffic and how best to battle congestions.